Core Team Previous Main Projects-Al Bustan Hotel and Leisure Complex
Modern office lobby with reception desk and seating area, featuring sleek interior design and ambient lighting.
Core Team Previous Main Projects-Al Bustan Hotel and Leisure Complex

PROJECT NAME:  

Al Bustan Hotel and Leisure Complex

Client: J&P Saudi Arabia

LOCATION: 

Riyadh, KSA

BUILT UP AREA:

50,000.0 m2

DESCRIPTION: 

Project consists of a G+2 hotel, a G+2 conference center, and a B+G+1 recreational center that includes a semi-Olympic swimming pool, badminton courts and a full-size ice hockey rink

SCOPE OF WORK:

Preparation of MEP IFC Design Drawings

As a design a built project

Core Team Previous Main Projects-Crown Plaza hotel
Core Team Previous Main Projects-Crown Plaza hotel
Core Team Previous Main Projects-Crown Plaza hotel

PROJECT NAME:  

Crown Plaza Hotel

Client: Contracting & Construction Enterprises CCE

LOCATION: 

Riyadh, KSA

BUILT UP AREA:

120,000.0 m2

DESCRIPTION: 

Project located in the prestigious development of ITCC in Riyadh. The scope of work included design verification, redesign and shop drawings production

SCOPE OF WORK:

Design verification, redesign and preparation of HVAC shop drawings with total of 200 sheets

Core Team Previous Main Projects-Souq Waqif Underground Parking
Core Team Previous Main Projects-Souq Waqif Underground Parking

PROJECT NAME:  

Souq Waqif Underground Parking

Client: Private Engineering Office

LOCATION: 

Doha, Qatar

BUILT UP AREA:

43,000.0 m2

DESCRIPTION: 

A fully air-conditioned underground parking consists of two basement floors, three cinema theaters, with a pleasant plaza at the ground floor

SCOPE OF WORK:

Preparation of MEP IFC Design Drawings

Core Team Previous Main Projects-Asmakh Develpment
Core Team Previous Main Projects-Asmakh Develpment

PROJECT NAME:  

Asmakh Development

Client: Private Engineering Office

LOCATION: 

Doha, Qatar

BUILT UP AREA:

77,000.0 m2

DESCRIPTION: 

The buildings located in this development are served with utilities through an underground service tunnel, which runs below main roads. The 1.3 km service tunnel caters the power cables, low current cables, water and fire protection piping. Drainage and storm water networks are located outside the tunnel directly buried

SCOPE OF WORK:

Preparation of MEP Tender Design Drawings

Core Team Previous Main Projects-Al Hail Mixed Use Development

PROJECT NAME:  

Al Hail Mixed Use Development

LOCATION: 

Muscat, Oman

BUILT UP AREA:

120,000.0 m2

DESCRIPTION: 

A mixed-use development including middle class residential units, commercial buildings and community amenities.

The scope of work included assisting the client in developing the scheme design for the whole development, designing the infrastructure utilities as well as coordinating with relevant authorities. The infrastructure design including power substations, water and drainage networks